SB9: Difference between revisions

From WikiDemocracy
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 9: Line 9:


126 Acadia Ave 004-042-21 .01580 acres  6882.4800 sq feet.  
126 Acadia Ave 004-042-21 .01580 acres  6882.4800 sq feet.  
If you've determined that your project is eligible, you'll need to contact the Building & Safety Division on the building permit process. If your project includes a lot split, please also contact the Public Works Department for information on submitting a parcel map for review and recordation.
* Building & Safety Division: (831) 420-5110
* Public Works Department: (831) 420-5160 (lot splits)


== Phases of SB9 Process ==
== Phases of SB9 Process ==

Revision as of 11:14, 14 March 2023

Working Notes:

Use clear polycarb sheets on interior of glass bricks to create 3.5" air gap or about R-value 3.6 per inch plus 2 for glass brick or about r-14. Assuming a loss of efficiency that still puts us well under .3U (aprox .07 U)

Create a dutch door type of in combo with a custom window for upstairs egress/large furniture entry (28x80). Custom upper window constructed with 2x4 notched toward front and back to create 3" airgap. 3 sides secured permanently fourth side screwed in place to allow removal and insertion of glass .Aprox R 12 or (U .085)


Blocking joists and rafters at ends: Idea- Starting with center joist/rafter use precut blocks at 14.5" nailing or screwing (3.5") them in as joist rafters are added. Staggering single blocking so both ends and bottom (with 6m" screws) can be attached. If double blocking is required a second one can be added with face nailing.

126 Acadia Ave 004-042-21 .01580 acres 6882.4800 sq feet.

If you've determined that your project is eligible, you'll need to contact the Building & Safety Division on the building permit process. If your project includes a lot split, please also contact the Public Works Department for information on submitting a parcel map for review and recordation.

  • Building & Safety Division: (831) 420-5110
  • Public Works Department: (831) 420-5160 (lot splits)

Phases of SB9 Process

  1. Division of lot- requires: surveying, resident owner 3 years after split (principal residence), meets city's criteria.
    1. How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out.
  2. Building or remodeling: front