SB9: Difference between revisions
mNo edit summary |
|||
Line 11: | Line 11: | ||
# Division of lot- requires: surveying, resident owner 3 years after split (principal residence), meets city's criteria. | # Division of lot- requires: surveying, resident owner 3 years after split (principal residence), meets city's criteria. | ||
## How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out. | |||
# Building or remodeling: front | # Building or remodeling: front |
Revision as of 09:27, 14 March 2023
Working Notes:
Use clear polycarb sheets on interior of glass bricks to create 3.5" air gap or about R-value 3.6 per inch plus 2 for glass brick or about r-14. Assuming a loss of efficiency that still puts us well under .3U (aprox .07 U)
Create a dutch door type of in combo with a custom window for upstairs egress/large furniture entry (28x80). Custom upper window constructed with 2x4 notched toward front and back to create 3" airgap. 3 sides secured permanently fourth side screwed in place to allow removal and insertion of glass .Aprox R 12 or (U .085)
Blocking joists and rafters at ends: Idea- Starting with center joist/rafter use precut blocks at 14.5" nailing or screwing (3.5") them in as joist rafters are added. Staggering single blocking so both ends and bottom (with 6m" screws) can be attached. If double blocking is required a second one can be added with face nailing.
Phases of SB9 Process
- Division of lot- requires: surveying, resident owner 3 years after split (principal residence), meets city's criteria.
- How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out.
- Building or remodeling: front