Created page with "Working Notes: Use clear polycarb sheets on interior of glass bricks to create 3.5" air gap or about R-value 3.6 per inch plus 2 for glass brick or about r-14. Assuming a loss of efficiency that still puts us well under .3U (aprox .07 U) Create a dutch door type of in combo with a custom window for upstairs egress/large furniture entry (28x80). Custom upper window constructed with 2x4 notched toward front and back to create 3" airgap. 3 sides secured permanantly fourth..."
 
No edit summary
 
(18 intermediate revisions by the same user not shown)
Line 1: Line 1:
Working Notes:
126 Acadia Ave 004-042-21 .01580 acres  6882.4800 sq feet.


Use clear polycarb sheets on interior of glass bricks to create 3.5" air gap or about R-value 3.6 per inch plus 2 for glass brick or about r-14. Assuming a loss of efficiency that still puts us well under .3U (aprox .07 U)
If you've determined that your project is eligible, you'll need to contact the Building & Safety Division on the building permit process. If your project includes a lot split, please also contact the Public Works Department for information on submitting a parcel map for review and recordation.  


Create a dutch door type of in combo with a custom window for upstairs egress/large furniture entry (28x80). Custom upper window constructed with 2x4 notched toward front and back to create 3" airgap. 3 sides secured permanantly fourth side screwed in place to allow removal and insertion of glass .Aprox R 12 or (U .085)
* Building & Safety Division: (831) 420-5110  [email protected]
* Public Works Department: (831) 420-5160 (lot splits) Curtis Busenhart $3,500  + surveyor. 8314205175 [email protected]
 
== Phases of SB9 Process ==
 
# Division of lot- requires: City application with Public Works $3,500 + surveying, resident owner 3 years after split (principal residence), meets city's criteria.
## How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out.
## Curtis Busenhart $3,500  + surveyor. 8314205175 cbusenhart@santacruzca.gov
## Here is what is required in order to submit an official application for an SB9 land division with the Public Works Dept.;
##Final Parcel Map submittal – Please include the existing building footprint if applicable, existing utilities (underground and aerial), proposed building envelope(s) on a 3rd non-titled plan sheet and title the lot split SB 9 on the map
##     2 Paper copies of Parcel Map and an electronic copy
##     Submit a response to the SB 9 requirements (They are listed under “Qualifying Criteria for a Housing Development or Lot Split)
##      Lot Closure Calculations
##      Preliminary Title Report
##     Soil Report – if located in a high liquefaction area or the slope is greater than 30%.
##    A check in the amount of $3,735.00 payable to the City of Santa Cruz ##Prior to recording the Parcel Map the current and next fiscal year’s property taxes must be paid in full
## Once approved print map in Mylar’s and submit to Public Works for the recordation process
##  A check  in the amount of $89.00 (recording fee) payable to the County of Santa Cruz
## Map submittal must be performed by a design professional and have a property survey included
# Building or remodeling: front
 
 
[[Text of California SB 9 Law|Text of Pasadena California SB 9 Law]]
 
[[Correspondence]]
 
[[Misc Information on Development ADU SB9]]
 
[https://drive.google.com/drive/folders/1-T2lYzGdEVNPimEfCqpf-yVrBDKJn_WY?usp=share_link Google Drive]
 
[[SB9 and ADU Construction Notes]]