SB9: Difference between revisions
From WikiDemocracy
Jump to navigationJump to search
Replaced content with "Working Notes: Use clear polycarb sheets on interior of glass bricks to create 3.5" air gap or about R-value 3.6 per inch plus 2 for glass brick or about r-14. Assuming a loss of efficiency that still puts us well under .3U (aprox .07 U) Create a dutch door type of in combo with a custom window for upstairs egress/large furniture entry (28x80). Custom upper window constructed with 2x4 notched toward front and back to create 3" airgap. 3 sides secured permanently fo..." Tag: Replaced |
No edit summary |
||
| (9 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
126 Acadia Ave 004-042-21 .01580 acres 6882.4800 sq feet. | |||
126 Acadia Ave 004-042-21 .01580 acres 6882.4800 sq feet. | |||
If you've determined that your project is eligible, you'll need to contact the Building & Safety Division on the building permit process. If your project includes a lot split, please also contact the Public Works Department for information on submitting a parcel map for review and recordation. | If you've determined that your project is eligible, you'll need to contact the Building & Safety Division on the building permit process. If your project includes a lot split, please also contact the Public Works Department for information on submitting a parcel map for review and recordation. | ||
| Line 20: | Line 11: | ||
## How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out. | ## How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out. | ||
## Curtis Busenhart $3,500 + surveyor. 8314205175 [email protected] | ## Curtis Busenhart $3,500 + surveyor. 8314205175 [email protected] | ||
## Here is what is required in order to submit an official application for an SB9 land division with the Public Works Dept.; | |||
##Final Parcel Map submittal – Please include the existing building footprint if applicable, existing utilities (underground and aerial), proposed building envelope(s) on a 3rd non-titled plan sheet and title the lot split SB 9 on the map | |||
## 2 Paper copies of Parcel Map and an electronic copy | |||
## Submit a response to the SB 9 requirements (They are listed under “Qualifying Criteria for a Housing Development or Lot Split) | |||
## Lot Closure Calculations | |||
## Preliminary Title Report | |||
## Soil Report – if located in a high liquefaction area or the slope is greater than 30%. | |||
## A check in the amount of $3,735.00 payable to the City of Santa Cruz ##Prior to recording the Parcel Map the current and next fiscal year’s property taxes must be paid in full | |||
## Once approved print map in Mylar’s and submit to Public Works for the recordation process | |||
## A check in the amount of $89.00 (recording fee) payable to the County of Santa Cruz | |||
## Map submittal must be performed by a design professional and have a property survey included | |||
# Building or remodeling: front | # Building or remodeling: front | ||
[[Text of California SB 9 Law|Text of Pasadena California SB 9 Law]] | |||
[[Correspondence]] | |||
[[Misc Information on Development ADU SB9]] | |||
[https://drive.google.com/drive/folders/1-T2lYzGdEVNPimEfCqpf-yVrBDKJn_WY?usp=share_link Google Drive] | |||
[[SB9 and ADU Construction Notes]] | |||