SB9: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
(13 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
126 Acadia Ave 004-042-21 .01580 acres 6882.4800 sq feet. | |||
If you've determined that your project is eligible, you'll need to contact the Building & Safety Division on the building permit process. If your project includes a lot split, please also contact the Public Works Department for information on submitting a parcel map for review and recordation. | |||
* Building & Safety Division: (831) 420-5110 jjezek@santacruzca.gov | |||
* Public Works Department: (831) 420-5160 (lot splits) Curtis Busenhart $3,500 + surveyor. 8314205175 cbusenhart@santacruzca.gov | |||
== Phases of SB9 Process == | |||
# Division of lot- requires: City application with Public Works $3,500 + surveying, resident owner 3 years after split (principal residence), meets city's criteria. | |||
## How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out. | |||
## Curtis Busenhart $3,500 + surveyor. 8314205175 cbusenhart@santacruzca.gov | |||
## Here is what is required in order to submit an official application for an SB9 land division with the Public Works Dept.; | |||
##Final Parcel Map submittal – Please include the existing building footprint if applicable, existing utilities (underground and aerial), proposed building envelope(s) on a 3rd non-titled plan sheet and title the lot split SB 9 on the map | |||
## 2 Paper copies of Parcel Map and an electronic copy | |||
## Submit a response to the SB 9 requirements (They are listed under “Qualifying Criteria for a Housing Development or Lot Split) | |||
## Lot Closure Calculations | |||
## Preliminary Title Report | |||
## Soil Report – if located in a high liquefaction area or the slope is greater than 30%. | |||
## A check in the amount of $3,735.00 payable to the City of Santa Cruz ##Prior to recording the Parcel Map the current and next fiscal year’s property taxes must be paid in full | |||
## Once approved print map in Mylar’s and submit to Public Works for the recordation process | |||
## A check in the amount of $89.00 (recording fee) payable to the County of Santa Cruz | |||
## Map submittal must be performed by a design professional and have a property survey included | |||
# Building or remodeling: front | |||
[[Text of California SB 9 Law|Text of Pasadena California SB 9 Law]] | |||
[[Correspondence]] | |||
[[Misc Information on Development ADU SB9]] | |||
= | [https://drive.google.com/drive/folders/1-T2lYzGdEVNPimEfCqpf-yVrBDKJn_WY?usp=share_link Google Drive] | ||
[[SB9 and ADU Construction Notes]] | |||
Latest revision as of 08:25, 11 May 2023
126 Acadia Ave 004-042-21 .01580 acres 6882.4800 sq feet.
If you've determined that your project is eligible, you'll need to contact the Building & Safety Division on the building permit process. If your project includes a lot split, please also contact the Public Works Department for information on submitting a parcel map for review and recordation.
- Building & Safety Division: (831) 420-5110 jjezek@santacruzca.gov
- Public Works Department: (831) 420-5160 (lot splits) Curtis Busenhart $3,500 + surveyor. 8314205175 cbusenhart@santacruzca.gov
Phases of SB9 Process
- Division of lot- requires: City application with Public Works $3,500 + surveying, resident owner 3 years after split (principal residence), meets city's criteria.
- How we could help- Guide homeowner though the process by reviewing qualifications and analyzing current site and proposing new site plan with build out.
- Curtis Busenhart $3,500 + surveyor. 8314205175 cbusenhart@santacruzca.gov
- Here is what is required in order to submit an official application for an SB9 land division with the Public Works Dept.;
- Final Parcel Map submittal – Please include the existing building footprint if applicable, existing utilities (underground and aerial), proposed building envelope(s) on a 3rd non-titled plan sheet and title the lot split SB 9 on the map
- 2 Paper copies of Parcel Map and an electronic copy
- Submit a response to the SB 9 requirements (They are listed under “Qualifying Criteria for a Housing Development or Lot Split)
- Lot Closure Calculations
- Preliminary Title Report
- Soil Report – if located in a high liquefaction area or the slope is greater than 30%.
- A check in the amount of $3,735.00 payable to the City of Santa Cruz ##Prior to recording the Parcel Map the current and next fiscal year’s property taxes must be paid in full
- Once approved print map in Mylar’s and submit to Public Works for the recordation process
- A check in the amount of $89.00 (recording fee) payable to the County of Santa Cruz
- Map submittal must be performed by a design professional and have a property survey included
- Building or remodeling: front
Text of Pasadena California SB 9 Law