Correspondence: Difference between revisions

From WikiDemocracy
Jump to navigationJump to search
 
Line 1: Line 1:
== Application Questions ==
Here is what is required in order to submit an official application for an SB9 land division with the Public Works Dept.;
1.       Final Parcel Map submittal – Please include the existing building footprint if applicable, existing utilities (underground and aerial), proposed building envelope(s) on a 3rd non-titled plan sheet and title the lot split SB 9 on the map
2.       2 Paper copies of Parcel Map and an electronic copy
3.       Submit a response to the SB 9 requirements (They are listed under “Qualifying Criteria for a Housing Development or Lot Split)
4.       Lot Closure Calculations
5.       Preliminary Title Report
6.       Soil Report – if located in a high liquefaction area or the slope is greater than 30%.
7.       A check in the amount of $3,735.00 payable to the City of Santa Cruz
8.       Prior to recording the Parcel Map the current and next fiscal year’s property taxes must be paid in full
9.       Once approved print map in Mylar’s and submit to Public Works for the recordation process
10.      A check  in the amount of $89.00 (recording fee) payable to the County of Santa Cruz
11.   Map submittal must be performed by a design professional and have a property survey included
== Fire Wall Questions ==
== Fire Wall Questions ==
Hi Kirk,
Hi Kirk,