ADU: Difference between revisions

From WikiDemocracy
Jump to navigation Jump to search
(Created page with "Foundation Notes- 1. Rebar chairs allow bending up towards center, making rebar too close to surface at center of slab. Remedy: Framing Notes: 1. Cuts at 3.56 degrees for upper walls.")
 
mNo edit summary
Line 1: Line 1:
Foundation Notes-  
Foundation Notes-  
1. Rebar chairs allow bending up towards center, making rebar too close to surface at center of slab. Remedy:
 
# Rebar chairs allow bending up towards center, making rebar too close to surface at center of slab. Remedy:
# Use twisting tool for tying rebar.
# Rent bender (weekly rate) and cutter for rebar.
# Used soil cement to create sharp edges on upper interior trench.
# Covered 100 % with 15mil underlayment requires UFER to be placed outside of trench or separate driven rods.





Revision as of 04:31, 6 March 2023

Foundation Notes-

  1. Rebar chairs allow bending up towards center, making rebar too close to surface at center of slab. Remedy:
  2. Use twisting tool for tying rebar.
  3. Rent bender (weekly rate) and cutter for rebar.
  4. Used soil cement to create sharp edges on upper interior trench.
  5. Covered 100 % with 15mil underlayment requires UFER to be placed outside of trench or separate driven rods.


Framing Notes:

1. Cuts at 3.56 degrees for upper walls.