ADU: Difference between revisions

From WikiDemocracy
Jump to navigation Jump to search
mNo edit summary
mNo edit summary
Line 6: Line 6:
# Used soil cement to create sharp edges on upper interior trench.  
# Used soil cement to create sharp edges on upper interior trench.  
# Covered 100 % with 15mil underlayment requires UFER to be placed outside of trench or separate driven rods.  
# Covered 100 % with 15mil underlayment requires UFER to be placed outside of trench or separate driven rods.  
# Make sure anchor bolts are placed properly during pour. They will need to be adjusted as pouring will move them.




Framing Notes:
Framing Notes:


1. Cuts at 3.56 degrees for upper walls.
# Cuts at 3.56 degrees for upper walls.
# Use wall jacks to lift walls.
#

Revision as of 04:33, 6 March 2023

Foundation Notes-

  1. Rebar chairs allow bending up towards center, making rebar too close to surface at center of slab. Remedy:
  2. Use twisting tool for tying rebar.
  3. Rent bender (weekly rate) and cutter for rebar.
  4. Used soil cement to create sharp edges on upper interior trench.
  5. Covered 100 % with 15mil underlayment requires UFER to be placed outside of trench or separate driven rods.
  6. Make sure anchor bolts are placed properly during pour. They will need to be adjusted as pouring will move them.


Framing Notes:

  1. Cuts at 3.56 degrees for upper walls.
  2. Use wall jacks to lift walls.