| Line 7: | Line 7: | ||
Blocking joists and rafters at ends: Idea- Starting with center joist/rafter use precut blocks at 14.5" nailing or screwing (3.5") them in as joist rafters are added. Staggering single blocking so both ends and bottom (with 6m" screws) can be attached. If double blocking is required a second one can be added with face nailing. | Blocking joists and rafters at ends: Idea- Starting with center joist/rafter use precut blocks at 14.5" nailing or screwing (3.5") them in as joist rafters are added. Staggering single blocking so both ends and bottom (with 6m" screws) can be attached. If double blocking is required a second one can be added with face nailing. | ||
== Phases of SB9 Process == | |||
# Division of lot- requires: surveying, resident owner 3 years after split (principal residence), meets city's criteria. | |||
# Building or remodeling: front | |||