Blocking joists and rafters at ends: Idea- Starting with center joist/rafter use precut blocks at 14.5" nailing or screwing (3.5") them in as joist rafters are added. Staggering single blocking  so both ends and bottom (with 6m" screws) can be attached. If double blocking is required a second one can be added with face nailing.
Blocking joists and rafters at ends: Idea- Starting with center joist/rafter use precut blocks at 14.5" nailing or screwing (3.5") them in as joist rafters are added. Staggering single blocking  so both ends and bottom (with 6m" screws) can be attached. If double blocking is required a second one can be added with face nailing.
126 Acadia Ave 004-042-21 .01580 acres  6882.4800 sq feet.