ADU: Difference between revisions
From WikiDemocracy
Jump to navigationJump to search
mNo edit summary |
mNo edit summary |
||
| Line 1: | Line 1: | ||
Demolition Notes- | |||
# When removing shiplap, I used a heavy rubber mallet and a 4x4 to knock outward on small sections of shiplap, working my way up and down the walls next to the studs. | |||
# When removing sheetrock I used a copper plumbing pipe and a rubber mallet to cut holes around the nails in the sheetrock then easily removing the full sheet without creating a mess. | |||
# When cutting the existing slab, I cut into 1'x2' section using a walk behind cement saw with a hose attached for wetting. I didn't how to slowly lower the spinning blade into the cement using an adjustment on the cement saw until I was almost done. | |||
Foundation Notes- | Foundation Notes- | ||