SB9

From WikiDemocracy
Revision as of 09:15, 14 March 2023 by Kirk (talk | contribs)
Jump to navigation Jump to search

Working Notes:

Use clear polycarb sheets on interior of glass bricks to create 3.5" air gap or about R-value 3.6 per inch plus 2 for glass brick or about r-14. Assuming a loss of efficiency that still puts us well under .3U (aprox .07 U)

Create a dutch door type of in combo with a custom window for upstairs egress/large furniture entry (28x80). Custom upper window constructed with 2x4 notched toward front and back to create 3" airgap. 3 sides secured permanently fourth side screwed in place to allow removal and insertion of glass .Aprox R 12 or (U .085)


Blocking joists and rafters at ends: Idea- Starting with center joist/rafter use precut blocks at 14.5" nailing or screwing (3.5") them in as joist rafters are added. Staggering single blocking so both ends and bottom (with 6m" screws) can be attached. If double blocking is required a second one can be added with face nailing.

Phases of SB9 Process

  1. Division of lot- requires: surveying, resident owner 3 years after split (principal residence), meets city's criteria.
  2. Building or remodeling: front